CODE: MAX4324G
LENGTH: 16 Hours (2 days)
PRICE: €1.560,00
This 2-day instructor led course provides students with an understanding of how Preventive Maintenance is configured in Maximo Application Suite - Manage including the creation of time and meter based Preventive Maintenance schedules, Master PMs, PM Hierarchies and PM Forecasting. Students will learn about topics such as Repair Facilities and Job Plan Sequencing. This course also has hands-on lab exercises using a Red Hat OpenShift Maximo Manage environment.
Consultants, System Administrators, Support, Sales, Users
Module 1: Introduction to Preventive Maintenance
Module 2: Time Based PMs
Module 3: Meter Based PMs
Demonstration: Creating PMs
Module 4: Job Plan Sequencing
Module 5: Master PMs
Student Exercises: Labs 1-2 PM Options, Master PMs and Time Based PMs
Module 6: PM Hierarchies
Module 7: PM Forecasting
Student Exercises: Labs 4 & 5 - PM Forecasting and Generate WO from a PM
Module 8: PM Options
Student Exercises: Lab 6 � Create Time Based PM with a Route
Module 9: PMs and Condition Monitoring for Linear Assets
Demonstration: PM Auto WO Generation Demo
Student Exercises: Lab 7 � Create a Meter Based PM
Module 10: Repair Facilities
Module 11: Condition Monitoring
Demonstration: Condition Monitoring
Student Exercises: Lab 8 � Condition Monitoring